Storage and transportation of polyurethane foam prefabricated insulation pipes
Release Time:
2019-01-31
Storage and transportation of polyurethane foam prefabricated insulation pipes
Storage and transportation of polyurethane foam prefabricated insulation pipes
Under normal circumstances, polyurethane foam prefabricated insulation pipe and key are transported to the construction site by car or train, and the consignee is responsible for the loading and unloading of the pipe.
1) The site should be level, free of debris and sufficient carrying capacity.
2) The same specifications of polyurethane foam prefabricated insulation pipe should be put together, indicating the specification and quantity, the maximum height of the code is 1.5 meters.
3) The insulation pipe should be protected from exposure and rain when stored, and covered with open cloth for storage in the open air.
4) The chemical raw materials involved in the construction shall be stored separately in the ventilated and cool warehouse according to the flammable products, and away from the fire source and heat source. Winter storage temperature is not lower than 10 ° C.
5) When stacking pipes, they must be padded with wooden mats. The width of the wooden blocks should be greater than 150mm and should be greater than 100mm. Straight together with the specification tube, starting from the ground, placing the blocks layer by layer, the number of spacers placed on each layer: when the tube length is 12m, there are 4 blocks from 1 to 3 layers and 3 blocks on 4 layers. The pipe fittings are arranged in the bottom of the wooden board.